Laserfiche WebLink
Chandler Martin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-05-655 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is$207.52 per additional daily trip-end generated in <br /> the Stockton area. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record.) (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> Note: Any construction activity that results in the disturbance of at least one (1)acre of soil shall require a State <br /> NPDES construction permit. <br /> MRC:SH:ar <br /> PACOMMENMSAWR 2005\PA-0500655.wpd <br />