My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007891
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1325
>
3500 - Local Oversight Program
>
PR0545007
>
ARCHIVED REPORTS_XR0007891
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 2:27:58 PM
Creation date
12/5/2019 1:47:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007891
RECORD_ID
PR0545007
PE
3528
FACILITY_ID
FA0025604
FACILITY_NAME
CATELLUS DEVELOPMENT PROPERTY
STREET_NUMBER
1325
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
1325 W WEBER AVE
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> t <br /> Pale <br /> SECTION 4 4-1 <br /> EVALUATION OF REMEDIAL ALTERNATIVES 4-1 <br /> Screening Criteria 4-1 <br /> Identification and Screening of Soil Remedial Alternatives 4-2 <br /> Excavation 4-2 <br /> On-Site Ex Situ Soil Aeration 4-3 <br /> Off-Site Soil Treatment 4-3 <br /> Landfilling 4-4 <br />' Soil Venting/Vapor Extraction 4-4 <br /> Bioremediation 4-5 <br /> Chemical Neutralization 4-5 <br /> No Action 4-6 <br /> Identification and Screening of 4-6 <br /> Physical Containment 4-6 <br /> Ground Water Extraction and Treatment 4-7 <br /> Biotreatment 4-8 <br /> Chemical Oxidation 4-8 <br /> Chemical Neutralization 4-9 <br /> No Action 4-9 <br /> 1 Selected Alternative 4-9 <br /> SECTION 5 5-1 <br />' DETAILED IMPLEMENTATION PLAN 5-1 <br /> Preparation 5-1 <br />' Permit Requirements 5-1 <br /> Health and Safety Plan 5-2 <br />' Soil Remediation 5-2 <br /> Excavation 5-2 <br /> Excavation Confirmation Sampling 5-3 <br /> Excavation Backfilling 5-5 <br /> Soil Aeration 5-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.