My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007928
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1325
>
3500 - Local Oversight Program
>
PR0545007
>
ARCHIVED REPORTS_XR0007928
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 2:39:37 PM
Creation date
12/5/2019 2:20:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007928
RECORD_ID
PR0545007
PE
3528
FACILITY_ID
FA0025604
FACILITY_NAME
CATELLUS DEVELOPMENT PROPERTY
STREET_NUMBER
1325
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
1325 W WEBER AVE
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Excavation activities proceeded until prevailing site conditions (e g , the <br /> •� presence of the buildings and encounter with ground water) prevented <br />' further excavation <br /> The purpose of this Plan is to describe the proposed additional <br /> remediation activities for UST Site #2 following demolition of the <br /> warehouses on site The remediation plan and the alternatives selection <br /> process is consistent with the Preliminary Assessment Report for Former <br /> Storage Tanks Located At 1325, 1541 and 1515 West Weber Avenue, Stockton, <br /> California (ERM-West, Inc , May 1993) (PAR), which was previously <br /> submitted to and approved by the County PHS/EHD <br />' Followingthis introduction, Section 2 provides the site background <br /> P �' <br /> information The scope of the previous investigations and site conditions <br /> are described in Section 3 Section 4 summarizes the evaluation of the <br /> remedial alternatives, and identifies the selected alternative Section 5 <br /> presents a detailed description of the implementation plan for soil <br /> remediation, and Section 6 outlines the proposed schedule An evaluation <br /> of the natural attenuation capacity associated with site conditions is <br />' provided in Attachment A <br /> 1 <br /> • <br /> 1-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.