My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1320
>
2900 - Site Mitigation Program
>
PR0012831
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 4:22:14 PM
Creation date
12/5/2019 4:07:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0012831
PE
2960
FACILITY_ID
FA0004036
FACILITY_NAME
UNION ICE/DONS DISTRIBUTION
STREET_NUMBER
1320
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
14519013
CURRENT_STATUS
02
SITE_LOCATION
1320 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County April 17, 1997 <br /> Ms.Mary Meays -2- 953-7001 <br /> permit, pressure grouting the wells in accordance with the guidelines set forth in Section 6, <br /> of the Well Standards established by San Joaquin County,Public Health Services and <br /> reporting the results of the decommissioning to the SJCHD. <br /> Prior to decommissioning, the total well depth and the depth to the water table were <br /> measured in each well. The christy boxes were then removed. Monitoring well MW-4D was <br /> partially obstructed by a broken well cap which was removed prior to grouting.The grout <br /> mixture was mechanically mixed at a ratio of approximately 5 gallons of water per 94 lb. <br /> sack of Type I/II cement. The wells were then pressure grouted through a tremmie pipe <br /> from the bottom of the well to the surface. Grout was allowed to spill over into the christy <br /> box excavation. At locations within pave areas the upper 4 to 6 inches was backfilled with <br /> concrete to be flush with the surrounding pavement. The grouting procedure was observed <br /> by Mary Meays from the San Joaquin County, Public Health Services, Environmental Health <br /> Division. The well locations are shown on Figure 1. Table 1 presents a summary of the well <br /> decommissioning details. <br /> If you have any questions, please do not hesitate to contact the undersigned. <br /> Sincerely, <br /> GOLDER ASSOCIATES INC. <br /> {&4L \,-D kws' > <br /> M.June James, P.E. <br /> Project Engineer <br /> Diane L. Sarmiento,P.E. <br /> Senior Engineer <br /> MJJ/DLS/ca <br /> Attachment: Table 1 - Monitoring Well Decommissioning Details <br /> Figure 1 -Site Plan <br /> cc: Mr.Jeff Lawson <br /> c/o Reed Elliott Creech and Roth <br /> 99 Almaden Boulevard,Eighth Floor <br /> San Jose,California 95113-1606 <br /> 9537001.L05 Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.