Laserfiche WebLink
r Q. <br /> �f <br /> ETS ENVIRONMENTAL PROJECT 302 <br /> PAGE <br /> 3. 0 SCHEDULE <br /> Werk on this phase of the investigation can commence <br /> immediately after approval has been obtained from the San <br /> Joaquin Local Health District <br /> It is anticipated that the field work can be completed <br /> within three working days. The report should be completed <br /> within 30 days after the field work has finished. This is <br /> based on a two to three week turnaround for the laboratory. <br /> 4. 0 ADDITIONAL INFORMATION <br /> A survey of underground utility lines was conducted. <br /> The lines have been located on the site plans. Underground <br /> Service Alert (USA) will be contacted prior to the <br /> commencement of any drilling operation. <br /> 5. 0 REMARKS AND SIGNATURES <br /> This workplan has been prepared using standard industry <br /> practices and represents our professional opinion as to the <br /> amount of work required to achieve the desired results. All <br /> work is to be conducted in a professional manner according to <br /> the protocol attached. <br /> Prepared By- <br /> Glen Ta White Date <br /> Project Geologist <br /> Reviewed and Approved By: <br /> Dick Stratton Date <br /> General Manager <br /> E <br />