My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
FIELD DOCUMENTS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 2:57:11 PM
Creation date
12/6/2019 2:44:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
FileName_PostFix
FILE 1
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^ <br /> SAMPLING PROTOCOL <br /> Page: 2 <br /> cuttings be incorporated into the soil treatment program and <br /> abandoned in place after treatment. <br /> WELL CONSTRUCTION AND DEVELOPMENT <br /> All materials used in well construction will be <br /> thoroughly cleaned prior to introduction into the boring. A <br /> bentonite or bentonite and cement slurry will be placed at <br /> the bottom of the boring as necessary. After the seal has <br /> been allowed to set enough to support the weight of the <br /> casing a 2 to 6 inch OD well casing (stainless steel or PVC) <br /> with and end cap, factory perforated for placement into the <br /> saturated zone, will be placed in the boring. The screen and <br /> filter pack sizes will be designed based upon sieve analysis <br /> data for samples as representative as possible of the water <br /> bearing formation. The casing and end caps will be threaded <br /> or joined by stainless steel screws, no PVC cement will be <br /> used. The filter pack will extend two feet above the <br /> perforated zone. A seal of bentonite pellets one to two feet <br /> thick will be placed in the annular space above the filter- <br /> pack, <br /> ilterpack, followed by a bentonite or cement slurry to grade. All <br /> filter pack and well seals will be tremmied through the auger <br /> as necessary. <br /> A water-tight cap will be placed on top of the well <br /> casing inside a water-tight well box cemented into place. <br /> All wells will be labeled on the exterior of the well head <br /> containment structure with well type and identification <br /> number. On the interior, the label will contain well type, <br /> identification number, depth, and the perforation interval. <br /> Monitoring wells will be developed by airlifting with <br /> compressed nitrogen or pumped using suitable pumping <br /> equipment. <br /> SAMPLING <br /> All soil and groundwater samples will be properly <br /> labeled with project number, date collected, and sample <br /> identification number. All samples will be handled using <br /> standard chain of custody procedures. Field records will <br /> document the above information and other significant data, <br /> such as names of on-site personnel, sampling methods, date <br /> and time of sampling, the number of well volumes removed <br /> before sampling, and any preservatives added or filtration <br /> performed on samples. <br /> The samples will be refrigerated and packaged <br /> immediately for delivery to the laboratory, and will under no <br /> circumstances be opened by anyone other than laboratory <br /> personnel. Chain of Custody records will be maintained at <br /> all times. <br />
The URL can be used to link to this page
Your browser does not support the video tag.