My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
WORK PLANS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 4:58:58 PM
Creation date
12/6/2019 2:58:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVE <br /> JUL 23 2012 <br /> APEX ENVIRONMENTAL HEALTH <br /> E NVI: ROTE C' , I I C . 11244 Pyries Way-Go <br /> :Phone 916.851.0174•Fax 916-851-017ToIFree1 800�2s42 5249CES <br /> July 16, 2012 <br /> Ms. Victoria L. McCartney, REHS <br /> San Joaquin County Environmental Health Department. . <br /> 600 E Main Street - <br /> Stockton, California 95202-3029 <br /> Subject: Well Destruction Workplan <br /> Former Moore Petroleum Bulk Plant <br /> 5491 `F' Street, Banta, California <br /> Apex Project No. ERA02.004 <br /> Dear Ms. McCartney:. <br /> Apex Envirotech, Inc. (Apex) has been authorized by Moore Petroleum (Moore) and Van De Pol <br /> Enterprises to provide this well destruction workplan proposing to destroy all monitoring and <br /> remediation wells associated with the subject site. This workplan was prepared in response to <br /> correspondence from the San Joaquin County Environmental Health Department(SJCEHD) <br /> i <br /> dated April 19, 2012 (Appendix A). <br /> This workplan is based, in part, on information obtained by Apex from Moore, and is subject to <br /> modification as newly acquired information may warrant. <br /> BACKGROUND <br /> Apex began work on this project with groundwater.0 monitoring beginning on January 14, 1994.Prior to Apex, work conducted at the site included subsurface investigations and groundwater <br /> monitoring by Earth Treatment Systems(ETS), Inc. of Manteca, California, Delta Environmental <br /> Consultants, Inc. (Delta) of Rancho Cordova, California,Nations Groundwater Associates <br /> (NGA) of Sacramento, California, and Aegis Environmental, Inc. (Aegis) of Roseville, <br /> California. Site details of work completed prior to Apex's work at the site were obtained in <br /> Aegis's Quarterly Groundwater Monitoring Report,dated April 18, 1991, which was submitted <br /> to Moore. <br /> Prior to August 1988—ETS.installed monitoring well MW-1: Results were presented in ETS's <br /> Environmental Preliminary Site Assessment, dated August:1988. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.