Laserfiche WebLink
i <br /> Well Destruction Workplan <br /> Moore Petroleum Bulk Plant,5491 `F'STieet,Banta,California ' <br /> Page 9 " <br /> REMARKS AND SIGNATURES <br /> The informationcontained within this workplan reflects our professional opinions and was <br /> developed in accordance with currently available information, and accepted hydrogeologic and <br /> engineering practices. <br /> The work described above will be performed under the direct supervision of the professional <br /> geologist, registered with.the State of California, whose signature,appears below. <br /> Apex appreciates the opportunity to provide Moore with geologic, engineering, and <br /> environmental consulting services, and trust this workplan meets your needs. If you have any <br /> questions or comments, please call us at 916-851-0174. <br /> Sincerely,, <br /> APEX ENVIROTECH, INC. <br /> r ' CH 6247 <br /> t EXP. q IZ <br /> Dan Lafontaine, P.E. caEMIG��' r` <br /> California Registered Professional 7 � <br /> Chemical Engineer No. 6247 <br /> \pNAL G�cOlo <br /> p TREVOR <br /> M. Us <br /> HARTWELL <br /> • No.8774 • <br /> ;revor <br /> . Hartwell OF <br /> California Professional Geologist.No. 8774 <br /> r <br /> lel <br /> " <br />