Laserfiche WebLink
Igg" s _ <br /> Y <br /> va <br /> QUARTERLY GROUND WATER MONITORING REPORT <br /> 5491 F°VeeL Berm.Celftrda <br /> 2.0 QUARTERLY MONITORING DATA <br /> This section of the report presents the results of the monitoring of groundwater elevations <br /> 4.4 and groundwater analytical laboratory data collected since August 1988. Aegis'Standard <br /> Operating Procedures (SOP)for sample collection,sample handling and sample analysis <br /> are presented in Appendix A. <br /> 2.1 Groundwater Level Measurements <br /> Water levels have been measured twice prior to, and once during this reporting period. <br /> Water level measurements were made from the referenced well head elevations (top of <br /> casing), measured to the nearest 0.01 foot and are summarized in Table 1. Well head <br /> elevations were surveyed by previous consultants or their agents, and are referenced to <br /> - mean sea level. <br /> I <br /> too IMM JIMMOR <br /> I <br /> i f i 1 <br /> E�' t <br /> I <br />