Laserfiche WebLink
CUARTERLY GROUND WATER MONITORING REFGRT <br /> rM 9691 F Street.Bama.cavarma <br /> Work completed through August 1988 by EE•S, included: <br /> o Drilling of one soil bdring which was completed as groundwater monitoring <br /> well MW-1; <br /> o Collection of soil samples during drilling and ground water ,amples after <br /> wall development; <br /> - o Submittal of soil and groundwater samples for analytical testing; and <br /> _- o Preparation of an Environmental Preliminary_Site Assessment report. <br /> Work completed through May 1989 by Delta included: <br /> o Drilling of two soil borings which were completed as groundwater <br /> monitoring wells MW-2 and MW-3; <br /> o Collection of soil samples during drilling and ground water samples after <br /> I <br /> well development; <br /> o Submittal of soil and groundwater samples for analytical testing; <br /> o Measurement and calculation of groundwater flow direction and hydraulic <br /> - gradient; and <br /> o Preparation of a Preliminaa[y Hydrogeologic Assessment Report. <br /> Work completed through August 1990 by NGA included: <br /> a Drilling of three soil borings which were completed as <br /> p groundwater <br /> monitoring wells MW-4 through MW-6; <br /> -^ o Collection of soil samples during drilling and ground water samples after <br /> well development; <br /> V o Submittal of soil and groundwater samples for analytical testing; <br /> o Measurement and calculation of groundwater flow direction and hydraulic <br /> y gradient; and <br /> o Preparation and submittal of a Problem Assessment Report utilizing the <br /> analytical results of the groundwater sampling event of 6 July 1990. <br /> -7. <br />