Laserfiche WebLink
15.74 I <br /> L!1 <br /> Septic F'- <br /> Tank <br /> - - -1 Dispenser W <br /> - - Island t} <br /> Warehouse <br /> Office = <br /> H <br /> X <br /> U] <br /> 15.67" ❑ T-9 <br /> 15.60 ❑ -' T-8 <br /> MW-1 / <br /> MW-4 <br /> 15.56 <br /> ❑ MW-3 <br /> 7-1 ,1 -211 -3 -4 1:T-5 i i !,'j-7 i <br /> �, tI it ft. �+ <br /> MW-2 � , � _ <br /> MW-5 %%,., 1 I660 <br /> 15,71 `` ` <br /> 15.66 <br /> Gas' Is6S <br /> �S <br /> Line' <br /> �O <br /> F STREET <br /> LEGEND <br /> Monitoring Well Underground 5torge Tanks <br /> (T-1) 10,000-Gallon Diesel <br /> Potentiometric Surface Contour Line (T-2) 10,000-Gallon Regular Unleaded Gasoline <br /> (Dashed Where Inferred) (T-3) 10,000-Gallon Premium Unleaded Gasoline <br /> (T-4) 10,000-Gallon Regular Leaded Gasoline <br /> 15.60 Groundwater Elevation in Feet (T-5) 10,000-Gallon Regular Leaded Gasoline <br /> Elevation Corrected For Floating (T-6) 10,000-Gallon Diesel <br /> (T-7) 10,000-Gallon Diesel <br /> Liquid Hydrocarbons (T-8) 350-Gallon Kerosene <br /> Estimated Direction of Groundwater Flaw (T-9) 350-Gallon Cleaning Solvent <br /> NOTES <br /> Hydraulic Gradient=0.0002 ft. /ft. Site Sketch After Nations <br /> Contour Interval=0.05 ft. Groundwater Associates Site Map <br /> Project No. 10-80-481 0 30 60 <br /> Approximate Scale <br /> All Locations Are Approximate 1-=30- <br /> . . . <br /> 0' <br /> POTENTIOMETRIC SURFACE MAP FIGURE <br /> July 7, 1993 <br /> 2VVN$Y. 4 <br /> DATE: <br /> ti D. Hada June 1,1993 <br /> �visEtsa�r: DATE:August <br /> Petroleum <br /> J. Paradis August 4,1993 5491 F Street PROJECT NUMBER: <br /> REVISED <br /> BY: DATE: Banta, CA 10-90099 <br />