Laserfiche WebLink
T <br /> r <br /> 16 <br /> 7 5 <br /> 15. <br /> 4) I �,\ <br /> J <br /> M <br /> 15 <br /> c � <br /> M <br /> m <br /> w 14.5 <br /> r 14 <br /> m <br /># W 13.5 <br /> 13 <br /> c <br /> LC o <br /> 12.5 <br /> 12 <br /> r <br /> Oct Nov Dec Jan Apr Jul Oct <br /> Date of Measurement (1991-1992) <br /> ■ - — • <br /> MW 1 MW-2 MW-3 MW-4 <br /> MW-5 MW6 <br /> l <br /> G1EC€ 1�OIiiUII GROUNDWATER ELEVATION HYDROGRAPH FIGURE <br /> DRAWNW: oR�: 3 <br /> Ed Bernard Number 1,1992 <br /> a=u�oev: DAM, Moore Petroleum <br /> 5491 F Street PROJECT NUMBER: <br /> BY: H DAM" <br /> 12Banta,CA 10-90099 <br /> f` 5 - z �r2 <br />