My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011781
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
ARCHIVED REPORTS_XR0011781
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 5:08:37 PM
Creation date
12/6/2019 3:41:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011781
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v <br /> First Quarter 1996 Groundwater Monitoring&Remediation Status Report <br /> Moore Petroleum,Inc.,5491'T'Street,Banta,CA <br /> April 2, 1996 <br /> Page 3 <br /> REMEDIATION STATUS <br /> On May 5, 1995, a soil vapor extraction system consisting of an R S.I. SAVE system was <br /> installed at the subject site. The vapor extraction system was installed per San Joaquin Valley <br /> Unified Air Pollution Control District(SJVUAPCD)Permit conditions. The vapor extraction <br /> system consists of an internal combustion engine with catalytic converters mounted on the <br /> exhaust. The system was set up such that soil vapors could be extracted from either vapor well <br /> VW-1 and/or monitoring well MW-1. The vapor extraction system was initially and is currently <br /> configured to extract soil vapors from VW-1. The system was started on May 5, 1995, and has <br /> operated through October 4, 1995, at which time it was temporarily removed from site. On <br /> November 27, 1995,the system was returned to the subject site and restarted. During this <br /> reporting period,November 1995 through February 1996, soil vapor flow to the system has <br /> averaged at 8 cubic feet per minute(CFM). <br /> An air sparge system was installed for use in conjunction with the vapor extraction system. The <br /> air sparge system consists of a one horse power electric motor which powers a 10-CFM oil-less <br /> compressor. The air sparge system was started on May 31, 1995 and operated intermittently <br /> through August 30, 1995 at which time its operation began to coincide with the operation of the <br /> R S.I. system. The air sparge system has been configured to operate at 10 pounds of air per <br /> square inch(psi). <br /> Influent and effluent vapor samples have been collected on a monthly basis to demonstrate <br /> compliance with the SJVUAPCD Permit conditions. The samples were collected according to the <br /> Apex SOP included in Attachment 1 and submitted,under chain-of-custody, to Sparger <br /> Technology, Inc. of Sacramento, California, a state-certified laboratory. The samples were <br /> analyzed for concentrations of TPI, as gasoline, and BTEX. Analytical reports and chain-of- <br /> custody forms are included in Attachment 2. <br /> During this reporting period,vapor samples were collected for laboratory analysis on December <br /> 5, 1995, January 9, 1996, February 14, 1996 and on March 6, 1996. Based the vapor sample <br /> analytical results for March 6, 1996, the system extraction rate was 4.5 pounds per day(lb./day) <br /> as TPI, as gasoline, and 0.12 lb./day of benzene. As of March 6, 1996,the vapor extraction <br /> system has extracted 1,520 pounds of TPI, as gasoline, and 13.4 pounds of benzene. System <br /> operating data is contained in Table 3. Extraction rates and analytical results to date are <br /> contained in Table 4. Vapor extraction system sample calculations are contained in Attachment 3. <br /> Vapor samples were not collected for the month of November 1995 due to the temporary removal <br /> of the R S.1. unit from the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.