Laserfiche WebLink
COPY <br /> /////A 0P1EX <br /> r 7844 Madison Avenue,Suite 106 • Fair Oaks,CA 95628 <br /> E N V I R 0 T E C H , I N C . '1.800.242.5249 • Ph.916.S35.0200 • Fax 916.535.0207 <br /> May 11, 1995 <br /> Mr. Jerry Moore <br /> Moore Petroleum, Inc. 4y <br /> " 5491 "F" Street <br /> Banta, California 95304L/ 18 <br /> 19 0 <br /> AF� 91S <br /> Subject: Second Quarter Groundwater Monitoring Report <br /> Moore Petroleum, Inc. <br /> 5491 'F Street, Banta, California <br /> Apex Project No. ERA02.004 <br /> Dear Mr. Moore: <br /> Apex Envirotech, Inc. (Apex), is pleased to provide Moore Petroleum, Inc. (Moore Petroleum), <br /> this report documenting the results of quarterly groundwater monitoring conducted on April 11 <br /> r= and May 2, 1995, at the subject site(Figure 1). The monitoring included collection of depth-to- <br /> groundwater measurements and groundwater samples from monitoring wells MW-1 through <br /> MW-6 located on site(Figure 2). <br /> This report is based,in part, on information obtained from Moore Petroleum, and is subject to <br /> modification as newly acquired information may warrant. <br /> BACKGROUND <br /> Apex began work on the project with the groundwater monitoring conducted on January 14, <br /> 1994. Prior to Apex, work conducted at the site included subsurface investigations and <br /> groundwater monitoring by Earth Treatment Systems, Inc., of Manteca, California, Delta <br /> Environmental Consultants, Inc., of Rancho Cordova, California,Nations Groundwater <br /> Associates of Sacramento, California, and Aegis Environmental, Inc. (Aegis), of Roseville, <br /> California. Site details may be found in a "Quarterly Groundwater Monitoring Report," dated <br /> April 18, 1991, submitted to Moore Petroleum by Aegis. <br /> i <br />