My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011800
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
ARCHIVED REPORTS_XR0011800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 5:10:43 PM
Creation date
12/6/2019 3:47:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011800
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br /> APEX <br /> E N V I R O T E C H INC , 7844 Madison Avenue,Suite 106 • Fair Oaks,CA 95628 <br /> 1.800.242.5249 • Ph.916.535.0200 • Fax 916.535.0207 <br /> July 8, 1998 <br /> Mr. Jerry Moore <br /> Moore Petroleum, Inc. <br /> 5491 "F" Street <br /> Banta, California 95304 <br /> Subject: Second Quarter 1998 Groundwater Monitoring Report <br /> Moore Petroleum, Inc. <br /> 5491 "F" Street, Banta, California <br /> Apex Project No. ERA02.004 <br /> Dear Mr. Moore: <br /> Apex Envirotech, Inc. (Apex), is pleased to provide Moore Petroleum, Inc. (Moore Petroleum), <br /> this report documenting the results of the quarterly groundwater monitoring conducted on April <br /> 30, 1998, at the subject site(Figure 1). The monitoring included collection of depth-to- <br /> groundwater measurements from monitoring wells MW-1 through MW-6, and groundwater <br /> samples from monitoring wells MW-1 and MW-4 located on site (Figure 2). <br /> This report is based, in part, on information obtained from Moore Petroleum, and is subject to <br /> modification as newly acquired information may warrant. <br /> BACKGROUND <br /> Apex began work on the project with the groundwater monitoring conducted on January 14, <br /> 1994. Prior to Apex, work conducted at the site included subsurface investigations and <br /> groundwater monitoring by Earth Treatment Systems, Inc., of Manteca, California;Delta <br /> Environmental Consultants, Inc., of Rancho Cordova, California;Nations Groundwater <br /> Associates of Sacramento, California; and Aegis Environmental, Inc. (Aegis), of Roseville, <br /> California. Site details may be found in a"Quarterly Groundwater Monitoring Report," dated <br /> April 18, 1991, submitted to Moore Petroleum by Aegis. <br /> On May 5, 1995, a soil vapor extraction system consisting of an R.S.I. SAVE system was <br /> installed at the subject site. The vapor extraction system was installed per San Joaquin Valley <br />
The URL can be used to link to this page
Your browser does not support the video tag.