My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011840
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
ARCHIVED REPORTS_XR0011840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 5:15:13 PM
Creation date
12/6/2019 4:35:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011840
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
View images
View plain text
An existing SVE system is already in place at the site and associated piping has been installed <br /> to the well head at MW-8. <br /> • Well MW-8 was constructed for the purpose of SVE remediation. Prior to well installation, <br /> Apex anticipated the possibility of using well MW-8 as a remediation alternative for the site. <br /> • Well MW-9 is located in the proximity of well MW-8 (65-feet to the north) and Apex <br /> anticipates observing SVE influence at well MW-9. <br /> Specifically, Apex proposes a short-term, 48-hour SVE pilot test be performed on well MW-8 to <br /> determine the feasibility of SVE as a remedial alternative. Groundwater monitoring well MW-8 <br /> is a 4-inch diameter well. Remediation piping was installed from well MW-8 to the remediation <br /> compound during UST removal and over excavation. The proposed SVE pilot test would consist <br /> of connecting the existing piping to MW-8 and the existing RST Remediation Unit. <br /> Once the analytical data and field data are reviewed and evaluated, a"Revised Final Remediation <br /> Plan"will be prepared documenting the results of this investigation including a well search. <br /> Apex originally planned to utilize dual phase extraction, that is groundwater extraction in <br /> combination with SVE. However, Ms. Margaret Lagorio with the San Joaquin County <br /> Environmental Health Division informed Apex that no sanitary sewer system exists in the area. <br /> Therefore, no means is available to discharge the water extracted during the pilot test. Apex will <br /> look at the results of the SVE pilot test and determine if dual phase extraction is necessary to <br /> remediate the site. if the results of the pilot test warrant dual phase extraction, Apex will apply <br /> for a NPDES permit to discharge the treated water to a nearby stream. <br /> SITE SAFETY PLAN <br /> A Site Safety plan (SSP) will be prepared and will be on site during all field activities. All on- <br /> site work will be conducted according to the SSP. The SSP will contain information on the <br /> properties of the hazardous materials known to be on the site. This information is equivalent to <br /> the contained within Material Safety Data Sheets. <br /> A copy of this Workplan was submitted to: <br /> Mr. Mark List <br /> Central Valley Regional Water Quality Control Board <br /> 3443 Routier Road, Suite A <br /> Sacramento, California 95827-3098 <br /> Ms. M. Lagorio <br /> San Joaquin County Environmental Health Division <br /> P. O. Box 2009 <br /> Stockton, California 95201 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).