Laserfiche WebLink
RECOMMENDATIONS <br /> Based on the petroleum impacted`'groundwater found in�MW-8 and d MW-9,-Apex recommends <br /> p -8. <br />{: performing . a dual-phase remediation pilot test on groundwater monitoring well MW / <br /> 1 <br /> Groundwater monitoring well MW-8 is a four-inch diameter- well and remediation piping was <br /> placed during the UST removal and over excavation to MW-8 for possible future use. The <br /> .proposed dual-phase remediation;pilot test would consist of: connecting the remediation.piping to <br /> sed at the site in the past and is <br /> ' MW-8, connecting the existing RSI Remediation Unit (that was u <br /> still at the site), permitting the test with, the air board, and, modify the RSI .unit to -extract <br /> groundwater along with soil vapors. Once the proposed pilot test is approved by the County, <br /> Apex will submit a detailed cost estimate to the UST Cleanup Fund for pre-approval. <br /> A copy of this Report was submitted to: <br /> l; Mr. Mark List' _ <br /> Central ValleyRegional Water Quality Control Board <br /> # 3443 Routier Road, Suite A <br /> Sacramento, California,95827-3098 s <br /> Ms. M.Lagoria <br /> San Joaquin County Environmental Health Division .,, <br /> P. O. Box 2009, <br /> Stockton, California 95201 <br /> REMARKS/SIGNATURES <br /> ' The information contained within this Report . reflects. our professional opinions and .,was <br /> developed in accordance with currently available-information,-and accepted hydrogeologic and <br /> engineering practices. This Report was prepared solely for the use of- Moore Petroleum. Any. <br /> {' reliance on this Report by parties other than,Moore Petroleum will-be at their own risk. <br />