Laserfiche WebLink
� MW-11 1 <br /> (17.64) <br /> � <br /> ee <br /> � 0 MW-9 / /\IRP <br /> (17.69) �� <br /> X/ Storage I. ;,- <br /> Tanks O N c^ <br /> CP \ <br /> 00 <br /> �. MW-10 +(17.83) °l ' O <br /> (17.89) Dispenser co / <br /> /0 Islands �^ / <br /> RW-2 <br /> X 1 (17.94) (16.90) $(17.92) <br /> VEW-3/MW-8 <br /> f � f <br /> Building <br /> 18. <br /> (Mw-11) $(17.98) <br /> f �c S-1 MW-3 <br /> 184 <br /> (18. lanter <br /> ' <br /> VEW-1 4A <br /> M <br /> f Gate MW-7 $ <br /> MW-2 MW-5 <br /> (18.04)$ (18.04) <br /> f <br /> f F <br /> LEGEND <br /> $ Monitoring Well Location Groundwater Contour Line; <br /> Vapor Extraction Well Location _18.1 Dashed Where Inferred <br /> Va <br /> p (Contour Interval = 0.10 ft.) <br /> N 3s£ Recovery Well Location ��� Approximate Groundwater <br /> Gradient And Flow <br /> 0 50 100 3K Air Sparge Well Location o°ry Direction <br /> o• <br /> Approximate Scale <br /> 1 inch = 50 feet Source: Figure Modified From Survey Provided By Morrow Surveying. <br /> DRAWN BY: D. Alston <br /> M- GROUNDWATER CONTOUR FIGURE <br /> 02 MAPi NOVEMBER 1, 2001 <br /> REVISIONS ONS 3 <br /> APEX Moore Petroleum <br /> ENVIROTECH, INC. 5491 F Street PROJECT NUMBER: <br /> Banta, California <br /> ERA02.004 <br />