Laserfiche WebLink
A <br /> Interim Remediation Plan and Second Quarter 2001 Groundwater Monitoring Report <br /> Moore Petroleum Bulk Plant,5491 F Street,Banta,California <br /> Page 12 <br /> REMARKS/SIGNATURES <br /> The information contained within this report reflects our professional opinions and was <br /> developed in accordance with currently available information, and accepted hydrogeologic and <br /> engineering practices. This report was prepared solely for the use of Moore Petroleum. Any <br /> reliance on this report by parties other than Moore Petroleum will be at their own risk. <br /> The work described above was performed under the direct supervision of the professional <br /> i <br /> geologist, registered with the State of California, whose signature appears below. <br /> We appreciate the opportunity to provide Moore Petroleum geologic, engineering and <br /> environmental consulting services, and trust this Workplan meets your needs. If you have any <br /> questions or comments, please call us at(916) 535-0200. <br /> Sincerely, <br /> APEX ENVIROTECH, INC. <br /> i <br /> ichael S. Sgourakis <br /> Project Manager <br /> Pat Wright <br /> �p <br /> g R <br /> Principal Geologist P,�r•� �� � <br /> CRG No. 529 Q '�!► <br /> I 4[ No. 529 <br /> CA <br />