My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011857
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
ARCHIVED REPORTS_XR0011857
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 5:29:30 PM
Creation date
12/6/2019 4:40:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011857
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUARTERLY GROUND WATER MONITORING REPORT <br /> 5491 F Street,Banta,California <br /> 3.0 QUARTERLY MONITORING RESULTS <br /> Presented below is a summary of the results of Aegis' ongoing groundwater elevation <br /> monitoring and groundwater sample analytical testing. <br /> 3.1 Groundwater Elevations <br /> During the 1 February 1991 site visit, groundwater elevations were observed to range from <br /> 12.31 to 12.51 feet above mean sea level. The groundwater surface was observed to range <br /> from approximately 13 to 14 feet below existing grade. Based on groundwater elevation <br /> contouring by the SURFER® computer program using the Kriging method, the hydraulic flow <br /> direction is in an easterly direction. The average hydraulic gradient across the site for the <br /> 1 February 1991 data was approximately 0.002 feet per foot (ft/ft). <br /> A groundwater elevation contour map was drafted from the groundwater elevations measured <br /> on 1 February 1991 and is presented as figure 3. This contour map indicates the flow <br /> direction and calculated hydraulic gradient. <br /> A monitoring well hydrograph has been prepared showing the fluctuation of groundwater <br /> levels with time since the installation of the wells. The hydrograph is included as Figure 4. <br /> 3.2 Groundwater Analytical Results <br /> Monitoring wells were purged and groundwater samples were obtained according to Aegis' <br /> SOP, Appendix A. <br /> Concentrations of dissolved petroleum hydrocarbons in groundwater were reported below <br /> detectable levels in all wells except MW-1 for the 1 February 1991 sampling event. <br /> Laboratory analyses of the groundwater samples collected from the monitoring wells are <br /> summarized in Table 2. <br /> These results will be compared to ensuing groundwater sampling results to determine if the <br /> data is reproducible or if there is a changing trend in groundwater chemistry or flow. <br /> 4.0 SCHEDULE <br /> The next quarterly monitoring is scheduled for May 1991. <br /> 90-099A.RFr 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.