Laserfiche WebLink
Remediation mediation Status Report <br /> Moore Petroleum Bulk Plant,5491 F Street,Banta,Califomia `+ <br /> Page 8 <br /> Third Quarter 2003 Groundwater Monitorin <br /> REPORT DISTRIBUTION CONT. <br /> Site Manager: a Tom Van De Pol f <br /> Van De Pol Enterprises <br /> 1001 West Charter Way <br />}. Stockton, California 95206-1105 <br /> I <br /> ! REMA.RKSISIGNATURES <br /> i <br /> The information contained within this report reflects our professional. opinions and was <br /> developed in accordancewith currently available information, and accepted hydrogeologic and <br /> ' engineering practices. This report was prepared solely for the"use of Moore Petroleum. Any <br /> reliance on this report by,parties other than Moore Petroleum will'be at their own risk. <br /> The work described above. was .performed under the direct supervision of the professional <br /> -geologist, registered witli'the State of California, whose signature appears below. <br /> We appreciate the opportunity to provide Moore Petroleum geologic, engineering and ! <br /> k <br /> environmental-consulting services, and trust this report meets your needs: If"you have any <br /> questions or comments, please call us at (916) 851-0174.. <br /> Sincerely, ' <br /> I 1 <br /> APEX ENVIROTECH,--INC. <br /> Scott Romine ' <br /> Project,Manager ; <br /> MICHAEL <br /> f S <br /> �) SGOURAKIS {� <br /> U <br /> Michael S. Sgourakis, R.G. No.T q4 <br /> Senior Project Manager '11'! <br /> Or <br /> CRO No. 7194 I ��,G , <br /> qp',. <br /> I <br /> T j <br /> i <br />