Laserfiche WebLink
{ Second Quarter 2003 Groundwater Mon€toriq,Remediation Status Report <br /> Moore-Petroleum_Bulk Plant,549E F Street,Banta,California <br /> Page 8 <br /> REPORT DISTRIBUTION CONT. <br /> Site Manager: ' Tom Van De Pol <br /> Van De Pol Enterprises ' <br /> 1001 West Charter Way' <br /> Stockton, California 95206-1105 <br /> REMARKS/SIGNATURES <br /> The information contained within this report reflects our 'profes`sional. opinions and was ' <br /> developed"in accordance with currently available information, and accepted:hydrogeologic And , ? <br /> engineering-practices.. This report was"prepared solely for the use of-Moore Petroleum. Any <br /> reliance on this report by parties other than Moore Petroleum will be.at their.own risk. <br /> The work described above 'was performed under the .direct supervision of the professional <br /> geologist-, registered with.the State of California, whose signature appears below., , <br /> We appreciate the opportunity to provide Moore Petroleum. geologic, engineering and <br /> environmental consulting services, and trust .this report meets your needs. If you have any <br /> questions or comments,please call us at'(916) 851-0174.' .' . <br /> - Sincerely, <br /> APEX ENVIROTECH, INC. <br /> Y Scott.Romine <br /> Project Manager <br /> f RED GEpY <br /> M1 HAEL <br /> S. { <br /> �F SGOJRAKIS <br /> Michael-S. Sgourakis, R.G. �rJ, No. 714 <br /> Pr eManager <br /> Senior o ct <br /> '. CRGNo. 7194 . <br />