Laserfiche WebLink
(16,49) <br /> MW-1 1 <br /> r <br /> (16.60) <br /> M —9 <br /> '76' <br /> 60' Storage 0 TA 1% <br /> Tanks y. 0A <br /> dVEW C4' <br /> 61 MW-10 IF Di nser % <br /> o <br /> ' P\ (16.70) Islan S, <br /> % (16-71) <br /> Former RW-2 MW-12 <br /> CleaningX <br /> Solvent UST + +(16.67) <br /> (16.95) Former VEW-3 MW-8 <br /> 7'� -74- <br /> MW-15 Building <br /> (16.7 <br /> Building U <br /> (16-855) (16.75) <br /> -74- MW-1 (16.83)yc + <br /> AS-1 MW-4A MW-3 <br /> (16.91) �a'` DPlanter <br /> VEW-1 <br /> Gate + er <br /> -74- VEW-4/MW-7 Underg nd <br /> MW-2 MW-5 Storage Tars <br /> (16.87)+ (16.86) <br /> o' <br /> LEGEND <br /> + Monitoring Well Location Groundwater Contour Line; <br /> 1A 6.90— Dashed Where Inferred <br /> + Vapor Extraction Well Location (Contour Interval = 0.10 ft.) <br /> N X Recovery Well Location 41 Approximate Groundwater <br /> Gradient And Flow <br /> 0 50 100 0 Air Sparge Well Location 1� Direction <br /> A) <br /> Q, <br /> Approximate Scale <br /> 1 inch = 50 feet Source: Figure Modified From Survey Provided By Morrow Surveying. <br /> DRAWN BY: D. Alston <br /> DATE: 3/25/03 GROUNDWATER CONTOUR FIGURE <br /> Fm REVISIONS MAPa JANUARY 109 2003 3 <br /> APEX Moore Petroleum <br /> ENROTECH, INC. 5491 F Street PROJECT NUMBER: <br /> Banta, California ERA02.004 <br />