Laserfiche WebLink
/ (180) <br /> MW-1 1 \ <br /> X <br /> F0ce \\ <br /> i o � <br /> MW-9 <br /> Stodage ' NA <br /> Tacks / �� -0- <br /> 0 o <br /> (4,600} 16n <br /> VEW-2 14 <br /> MW-10 Dispense <br /> (5,400) Islands <br /> (400) <br /> F rrrser O RW-2 MW-12 <br /> vent)UST ND <br /> ND U-) p Former VEW / 8 <br /> f <br /> MW-6 p0� Building KeUSSTne( 1'000) <br /> (1,100) <br /> f f AS— BMW-1 MW 3 <br /> (480) <br /> (29,000) M4A", DPlanter <br /> .o+ VEW .i.;:.,ND Former <br /> G t <br /> f f VEW-4/MW-7 ND Underground <br /> MW-2 MW-5 Storage Tanks <br /> ND+ <br /> f <br /> SO <br /> f Q <br /> LEGEND <br /> Monitoring Well Location TPHd Concentration In <br /> (29,000) Groundwater Measured In <br /> Vapor Extraction Well Location ug/L <br /> N 0 Recovery Well Location ND Not Detected <br /> 0 50 100 0 Air Sparge Well Location <br /> Approximate Scale <br /> 1 inch = 50 feet Source: Figure Modified From Survey Provided By Morrow Surveying. <br /> DRAWN Br: D. Alston TPHd IN GROUNDWATER ISOCONCENTRATION FIGURE <br /> DATE: 3/25/03 MAPS JANUARY 9, 2003 <br /> REVISIONS 5 <br /> APEX Moore Petroleum <br /> ERROTECH, INC. 5491 F Street PROJECT NUMBER: <br /> Banta, California ERA02.004 <br />