My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011862
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
ARCHIVED REPORTS_XR0011862
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 5:37:33 PM
Creation date
12/6/2019 4:47:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011862
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fourth Quarter 2002 Groundwater Monitoring/Remediation Status Report <br /> Moore Petroleum Bulk Plant,5491 ;Street,Banta:California <br /> Page 3 <br /> Apex submitted a workplan titled, Workplan for Limited Subsurface Investigation, dated August <br /> 6, 1999, proposing the installation of four additional groundwater monitoring wells (MW-4A, <br /> MW-7, MW-8, and MW-9). During installation, well MW-8 was installed with the screen and <br /> filter pack extending well into the unsaturated zone for possible future use as a vapor extraction <br /> well. In addition, underground piping was installed from well MW-8 (VEW-3) to the former <br /> remediation compound (Figure 2). <br /> Apex submitted the report titled, Workplan for Limited Subsurface Investigation, dated April 27, <br /> 2000, proposing the installation of three additional groundwater monitoring wells and one deep <br /> soil boring. <br /> On July 25 and 26, 2000, Apex personnel supervised the installation of three groundwater <br /> monitoring wells (MW-10, MW-I1, and MW-12). The results of all soil and water sampling <br /> were documented in the report entitled, Results Report for Limited Subsurface Investigation and <br /> Third Quarter 2000 Groundwater Monitoring Report, dated August 25, 2000. <br /> Apex submitted the workplan titled, Workplan for Interim Remediation & 4th Quarter 2000 <br /> Groundwater Monitoring Report, dated November 17, 2000, proposing the installation of three <br /> recovery wells and one vapor extraction well using the three recovery wells for a pumping test. <br /> SJCEHD responded and only wanted one recovery well installed for the pumping test and <br /> depending on the results, more recovery wells could be installed. <br /> On January 8, 2001, Apex supervised the installation of one vapor extraction well (VEW-2) and <br /> one recovery well (RW-2). Results of the well installation can be found the report titled, Results <br /> Report for Limited Subsurface .Investigation and First Quarter 2001 Groundwater Monitoring <br /> Report, dated March 9, 2001. <br /> In March 2001, Apex performed a pumping test utilizing well RW-2. The results of the pumping <br /> test were reported in Apex's 2n`t Quarter 2001 Monitoring Report and Interim Remediation Plan <br /> dated June 1, 2001 <br /> On August 24, 2001, Apex over drilled and reinstalled well MW-7 as a vapor extraction well. On <br /> September 12, 2001, Apex personnel installed the remediation piping connecting wells MW-7, <br /> VEW-2, and VEW-3 to the remediation compound. <br /> Construction and assembly of the vapor extraction system was completed in June of 2002. The <br /> official start-up of the system was on June 17, 2002 as reported in the Source Test Results Report <br /> dated July 31, 2002, and a Remediation Status Report dated October 4, 2002. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.