Laserfiche WebLink
r <br /> Fourth Quarter 2002 Groundwater Monitoring/Remediation Status Report <br /> R Moore Petroleum Bulk Plant,5491 F Street,Banta,California i <br /> i <br /> Page 8 <br /> REPORT DISTRIBUTION CONT. <br /> Site Manager: Tom Van De Pol <br /> a Van De Pol Enterprises <br /> 1001 West Charter Way >. <br /> Stockton, California 95206-1105 <br /> REMARKS/SIGNATURES <br /> The r information' contained within this report reflects our professional . opinions and was <br /> developed in accordance with currently available information, and accepted hydrogeologic and <br /> engineering practices. This report was prepared .solely for the use of Moore Petroleum. Any ' <br /> reliance on this report by parties-other.than Moore Petroleum will be at their own risk. ' <br /> The work described above was performed under the direct supervision of the professional <br /> geologist, registered with the State of California,.whose signature appears below. <br /> We appreciate the opportunity to provide Moore Petroleum geologic,-, engineering and <br /> environmental consulting services, and trust this report meets your needs. if you have any <br /> •. questions or comments, please call.us at(916) 851-0174. <br /> Sincerely, <br />{ <br /> APEX ENVIROTECH, INC. <br /> Scott Romine <br /> Project Manager " <br /> (GOURAKIS <br /> Eo G� <br /> ICMAEt <br /> 1; <br /> S. <br /> Michael S. Sgourakis, R.G:- o. 7f94 <br /> Senior Project Manager ,� \T <br /> CRG No. 7194 <br />