Laserfiche WebLink
! f <br /> ` second Quarter 2002 Groundwater Monitoring Report <br /> Moore Petroleum Bulk Plant,5491 F Street,Banta,California <br /> Page 2 <br /> 1 and/or monitoring well MW-1. The system was started on May 5, 1995, and operated through <br /> October 4, 1995, at which time it was temporarily removed from the site. On November 27, <br /> 1995,the system was returned to the subject site and restarted. <br /> e system was installed for use in conjunction with the SVE system. The air sparge <br /> An air sparg y ) <br /> system consisted of a one horse power electric motor which powers a 10-cubic feet per minute <br /> (CFM) oil-less compressor. The compressor injected air through an air sparge point located <br /> midway between VEW-1 and MW-1 (Figure 2). The air sparge system was started on May 31, <br /> 1995 and operated intermittently through August 30, 1995, at which time its operation began to <br /> coincide with the operation of the R.S.I. system. F <br /> On April 29, 1997, Apex received permission from the San Joaquin County Environmental <br /> Health Division (SJCEHD) to shut down the air sparge and vapor extraction system due to low <br /> influent soil vapor concentrations to the vapor extraction system. As of April 29, 1997, the <br /> remediation system has extracted a total of 1,730 pounds of total petroleum hydrocarbons (TPH), <br /> as gasoline, and 19.9 pounds of benzene. <br /> Apex submitted the report titled, Over Excavation & Groundwater Removal Workplan, dated <br /> September 10, 1997, proposing over excavation, de-watering and sampling of the bulk loading <br /> rack and tank basins during the removal of nine underground storage tanks (UST). <br /> Apex supervised the removal of two 350 gallon USTs, T-8 and T-9 (kerosene and cleaning <br /> solvent, respectively) on August 17, 1998 and September 8, 1998, respectively. Also, seven <br /> 10,000 gallon USTs were removed on September 8, 1998. Results of the UST removal were <br /> documented by Apex in the report titled, Tank Closure Results and Recommendations Report, <br /> dated December 23, 1998. <br /> Following the removal of T-9, soil was over excavated and an exploratory trench was dug. Apex <br /> collected two soil samples and one groundwater sample from the over-excavation and <br /> exploratory trench. One soil sample was collected from beneath T-8. After the removal of the <br /> seven 10,000 gallon USTs, Apex collected four soil samples and one groundwater sample from <br /> the tank pit. Apex then collected six additional soil samples and two additional water samples <br /> from beneath the tank basin. Nine soil samples from the area beneath the former bulk loading <br /> rack were submitted for analysis. The results of all soil and water sampling were documented in s <br /> the report titled, Tank Closure Results and Recommendations Report, dated December 23, 1998, <br /> On April 8 and 9, 1999, Apex personnel supervised the advancement of eight soil borings at the <br /> subject property. The results of all soil and water sampling were documented in the report titled, } <br /> Results Report for Subsurface Investigation and Second Quarter 1999 Groundwater Monitoring, <br /> dated June 1, 1999. <br /> s <br />