Laserfiche WebLink
f R <br /> I <br /> Fourth Quarter 2004 Remediation Status Report <br /> i Moore Petroleum Bulk Plant,5441 F Street,Banta,California <br /> Page 7 <br /> REMARKS/SIGNATURES <br /> The information contained within this report reflects our,professional opinions and was <br /> developed in accordance with currently available information, and accepted hydrogeologic and <br /> engineering practices. This report was prepared solely for the use of Moore Petroleum. Any <br /> reliance on this report by parties other than Moore Petroleum will be at their own risk. <br /> The work described above was performed under the direct supervision of the professional <br /> {{ geologist, registered with the State of California,whose signature appears below. <br /> 1 <br /> We appreciate the opportunity to provide Moore Petroleum geologic, engineering and <br /> environmental consulting services, and trust this report meets your needs. If you have any <br /> questions or comments, please call us at(916) 851-0174. <br /> Sincerely, <br /> APEX ENVIROTECH, INC. <br /> Richard Johnson <br /> Remediation Department Manager Geo=� <br /> MICH <br /> S. <br /> SGOURAKIS <br /> ichael S. Vgg-ourakis, R.G. No 7194 <br /> Senior Project Manager <br /> a, CRG No. 7194 OF <br /> i <br /> I <br /> itE <br /> l <br /> i ' <br />