Laserfiche WebLink
MW-1 1 <br /> enoe <br /> O MW-9 <br /> s <br /> N o <br /> Storage <br /> Tanks �►. p <br /> O—2 � C11- <br /> MW-1 <br /> -, <br /> MW-1 , Dispenser 3 <br /> ,r <br /> f /y, Remediation Islands" <br /> Compound " Former �O SRW-2 MW-12 <br /> Cleaning ` <br /> Solvent U5T <br /> , <br /> Former VEW-3/MW-8+ <br /> f MW_6 ,;; Kerosene <br /> .` UST <br /> Building " <br /> f MW-1 <br /> MW-4A ; MW-3 <br /> i" W tt' <br /> p <br /> ._. OS-1 ,,'�,`zi �j�� �°'s`t�"' Planter <br /> VEW-1 Former <br /> Gate <br /> VEW--4/MW-7 w. $ Underground <br /> MW-2 MW-5 Storage Tanks <br /> f <br /> f SJ <br /> LEGEND <br /> Monitoring Well Location <br /> Vapor Extraction Well Location <br /> N 3st Recovery Well Location <br /> 0 50 100 Air Sparge Well Location <br /> Approximate Scale """--" Remediation Piping <br /> 1 inch = 50 feet Source: Figure Modified From Survey Provided By Morrow Surveying. <br /> DRAWN BY: D. Alston FIGURE <br /> DATE: 10/05/02 SITE PLAN MAP <br /> REVISIONS 2 <br /> /////A Moore Petroleum <br /> ENVIROTECH, INC. 5491 F Street PROJECT NUMBER: <br /> Banta, California ERA02.004 <br />