Laserfiche WebLink
r <br /> MW-11 <br /> MW-9 �y <br /> o y <br /> Storage O N 00- <br /> Tanks <br /> .� <br /> f �� o <br /> MW--10 <br /> y'"';Disan <br /> . <br /> islands <br /> rn <br /> Remediation :�'Q <br /> Compound Former RW-2 <br /> '' <br /> + Solvent'UST Mw-12 <br /> VEW-3/MW—s <br /> 74 MW-6 Former <br /> .-� <br /> ' Kerosene <br /> � UST � <br /> Building <br /> VEW—1 s`_� A'-- DPlanter <br /> f Gate �+1` <br /> f VEW-4/MW-7 hY Former <br /> -� Underground r <br /> MW-2+ MW-5 Storage Tanks <br /> I <br /> f <br /> LEGEND i <br /> Monitoring Well Location ' <br /> N + Vapor Extraction Well Location <br /> 3 Recovery Well Location <br /> 0 50 100 <br /> 38£ Air Sparge Well Location <br /> Approximate Scale <br /> 1 inch = 50 feet Remediation Piping <br /> Source: Figure Modified From Survey Provided By Morrow Surveying. <br /> } <br /> DRAWN 8Y: D. Alston <br /> DATE: 10/08/02 SITE PLAN MAP FIGURE <br /> REVISIONS <br /> APEX 2 { <br /> ENVIROTECH, INC. Moore Petroleum <br /> 5491 F Street PROJECT NUMBER: <br /> Banta, California <br /> 4 <br /> ERAQ2.00 <br /> 4 <br />