Laserfiche WebLink
I' MW-1 1 <br /> e <br /> Y-/ O MW-9 <br /> S � <br /> Storage O <br /> Tanks <br /> _,bVEW-2 o <br /> MW-10 m <br /> N Dispenser <br /> Islands <br /> Remediation _ <br /> Compound ForrnerRW--2 <br /> •Claaning SO MW-12 <br /> 5ahrent UST : -4 <br /> VEW-3/MW-8 <br /> f <br /> MW-6 '. Former <br /> A .•\ Kerosene <br /> Y <br /> UST <br /> Building•,..''�" <br /> MW <br /> AS-1 <br /> •'i }�3i. }rte' <br /> f Gate VEIN-4/MW—' Former <br /> Underground <br /> \ \ MW-2� MW_5 Storage Tanks i <br /> ' I <br /> f F <br /> i <br /> LEGEND <br /> i <br /> i <br /> Monitoring Well Location <br /> NVapor Extraction Well Location <br /> 3�f Recovery Well Location <br /> 0 50 100 .0 Air Sparge Well Location <br /> Approximate`Scale •----- Remediation Piping <br /> 1 inch = 50 feet Source: Figure Modified From SurveyProvided <br /> BY Morrow Surveying. <br /> DRAWN BY: D. Alston <br /> ,-- 10/Oa/a2 SITE PLAN MAP FIGURE <br /> REVISIONS <br /> ///APEX 2 <br /> EWIROTECH, INC. Moore Petroleum i <br /> 5491 F Street PROJECT NUMBER: <br /> Banta, California <br /> ERA02.004 <br />