My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011869
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
ARCHIVED REPORTS_XR0011869
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 5:42:22 PM
Creation date
12/6/2019 4:49:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011869
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. <br /> f ' <br /> Second Quarter 2004 Groundwater Monitoring/Remediation Status Report <br /> `f Moore Petroleum Bulk Plant,5491 F Street,Banta,California <br /> Page 2 <br /> On May 5, 1995, a soil vapor extraction (SVE) system consisting of an R.S.I. SAVETM system <br /> was installed at the subject site. The vapor extraction system was installed per San Joaquin <br /> Valley Unified Air Pollution Control District permit conditions. The SVE system consisted of an <br /> internal combustion engine with catalytic converters mounted on the exhaust. The system was <br /> configured so soil vapors could be extracted from either vapor well VEW-1 and/or monitoring <br /> well MW-1. The system was started on May 5, 1995, and operated through October 4, I995, at <br /> which time it was temporarily removed from the site. On November 27, 1995, the system was <br /> returned to the subject site and restarted. <br /> An air sparge system was installed for use in conjunction with the SVE system. The air sparge <br /> system consisted of a one horsepower electric motor which powers a 10-cubic feet per minute <br /> Wrn) oil-less compressor.. The compressor injected air through an air sparge point Iocated <br /> midway between VEW-1 nd MW-1 (Figure 2). The air sparge system.was started on May 31, <br /> 1995 and operated intermittently through August 30, 1995, at which time its operation began to <br /> coincide with.the operation of the R.S.I. system. ' <br /> On April 29, 1997, Apex received permission from the San Joaquin County Environmental <br /> Health Division (SJCEHD) to shut down the air sparge and vapor extraction system due to low <br /> influent soil vapor concentrations to the vapor extraction system. As of April 29, 1997, the <br /> remediation system had extracted a total of 1,730 pounds of total petroleum hydrocarbons, as gasoline (TPHg), and 19.9 pounds of benzene. <br /> Apex submitted the report titled, Over Excavation & Groundwater Removal Workplan, dated <br /> September 10, 1997, proposing over excavation, de-watering and sampling of the bulk loading <br /> rack and tank basins during the removal of nine underground storage tanks (UST). <br /> ` 1 <br /> Apex supervised the removal of two 350 gallon USTs, T-8 and T-9 (kerosene and cleaning <br /> solvent, respectively) on August 17, 1998 and September 8, 1998, respectively. Also, seven- <br /> 10,000-gallon USTs were removed on September 8,. 1998. Following the removal of T-9, soil <br /> was over excavated and an exploratory trench was dug. Apex collected two soil samples and one 1 <br /> groundwater sample from the over-excavation and exploratory trench. One soil sample was <br /> collected from beneath T-8. After the removal of the seven 10,000-gallon USTs, Apex collected <br /> four soil samples and one groundwater sample from the tank pit. Apex then collected six soil <br /> samples and two water samples from beneath the tank basin. Nine soil samples from the area <br /> beneath the former bulk loading rack were submitted for analysis. The results of all soil and <br /> water sampling were documented in the report titled, Tank Closure Results and 1 <br /> Recommendations Report, dated December 23, 1998. <br /> On April 8 and 9, 1999, Apex personnel supervised the advancement of eight soil borings at the <br /> subject property. The results of all soil and water sampling were documented in the report titled, <br /> -- Results Report for Subsurface Investigation and Second-Quarter 1999 Groundwater Monitoring, <br /> dated June 1, 1999. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.