Laserfiche WebLink
I Second Quarter 2004 Groundwater Monitoring/Remediation Status Report <br /> Moore Petroleum Bulk Plant,5491 F Street,Banta,Caiifomia - <br /> Page 9 <br /> REMARKS/SIGNATURES <br /> The information contained within this report reflects our professional opinions and was <br /> developed in accordance with currently available information, and accepted hydrogeologic and <br /> engineering practices. This report was prepared solely for the use of Moore Petroleum. Any <br /> reliance on this report b j <br /> P Y Parties other than Moore Petroleum will be at their own risk. <br /> The work described above was performed under the direct supervision of the professional <br /> geologist, registered with the State of California, whose signature appears below. i <br /> We appreciate the opportunity { <br /> PP pportunity to provide Moore Petroleum geologic, engineering and <br /> environmental consulting services, and trust this report meets your needs. If you have any <br /> questions or comments, please call us at (916) 851-0174. <br /> Sincerely, <br /> APEX ENVIROTECH, INC. <br /> Richard Johnson <br /> Remediation Department Manager v >, <br /> AEL <br /> k r� SGOURAKIS <br /> Michael S. Sgourakis, R.G. (P No. 7 94 <br /> Senior Project Manager :2. ':' <br /> CRG No. 7194 �izty= f <br /> I <br /> i <br /> i <br />