Laserfiche WebLink
i <br /> First Quarter 2004 Groundwater Monitoring/Remediation Status Report <br /> Moore Petroleum Bulk Plant,5491 F Street,Banta,California <br /> Page 5 <br /> Analysis Performed: <br /> Analysis Abbreviation Designation USEPA Method leo. <br /> Tota! Petroleum Hydrocarbons TPHg <br /> as Gasoline <br /> Total Petroleum Hydrocarbons TPWd <br /> as Diesel GaslDiesel- <br /> Total Petroleum Hydrocar!=Kerosene Range 8015 Modified <br /> as Kerosene Hydrocarbons <br /> Total Petroleum Hydrocarbons <br /> as Motor Oil TPHmo <br /> Benzene <br /> Toluene Aromatic <br /> Eth lbenzene BTEX Volatile 8020 <br /> X Ienes (Total) Organics <br /> Tertiary But I Alcohol TBA <br /> Methyl Tertiary Butyl Ether MTBE <br /> Di-isopropyl Ether DIPE Fuel <br /> Ethyl Tertiary Butyl Ether ETBE Oxygenates <br /> 82608 , <br /> Tertiar Amyl Methyl Ether TAME <br /> 1,2-Dichloroethane 1,2-DCA =Scaveandgers <br /> l <br /> ^* <br /> Ethylene Dibromide EDB ` <br /> REMEDIATION SYSTEM SUMMARY <br /> Soil Vapor Extraction System <br /> System description: <br /> Gasoline vapors are extracted from the subsurface through three monitoring/vapor wells (VEW- <br /> 3/MW-8, MW-1, and VEW-4/MW-7) and two vapor extraction wells (VEW-1 and VEW-2). The- <br /> wells are manifolded together with PVC piping in the remediation compound before connecting <br /> to the extraction system (Figure 2). The vapor extraction system is a 5-horsepower positive-, <br /> displacement blower discharging to a 100-cfm catalytic oxidizer where vapor is incinerated and <br /> discharged to the atmosphere. <br /> System startup date: June 17, 2002 <br /> Current system mode: Catalytic operation since startup <br /> Active extraction wells: L VEW-1 through VEW-4 <br /> Inactive extraction wells/reason: MW-1/system optimization, zero concentrations <br />