Laserfiche WebLink
r <br /> Fourth Quarter 2005 Groundwater Monitoring and Remediation Status Report <br /> Moore Petroleum Bulk Plant,5491 F Street,Banta,California <br /> Page 9 <br /> RECOMMENDATIONS <br /> i <br /> f Apex recommends continued groundwater monitoring to confirm laboratory data and monthly <br /> groundwater sampling of the domestic well. The next monitoring event is scheduled for March <br /> 2006. <br /> ADDITIONAL ACTIVITES PERFORMED AT SITE <br /> A results report documenting the installation of wells MW-13, MW-14, MW-16, and MW-17 is <br /> currently being prepared. Apex is currently attempting to gain access to the Rail Road's property <br /> S� <br /> to install proposed well MW-15. <br /> ATTACHMENTS: <br /> Figure 1: Site Vicinity Map <br /> Figure 2: Site Plan Map <br /> Figure 3: Groundwater Contour Map: December 12, 2005 <br /> Figure 4: TPHg in Groundwater Isoconcentration Map: December 12, 2005 <br /> Figure 5: TPHd in Groundwater Isoconcentration Map: December 12, 2005 <br /> Figure 6: TPHmo in Groundwater Isoconcentration Map: December 12, 2005 <br /> Figure 7: TPHkerosene in Groundwater Isoconcentration Map: December 12, 2005 <br /> Figure 8: Benzene in Groundwater Isoconcentration Map: December 12, 2005 <br /> Figure 9: MTBE in Groundwater Isoconcentration Map: December 12, 2005 <br /> Table 1: Well Construction Details <br /> Table 2: Groundwater Elevation Data <br /> Table 3: Groundwater Analytical Data <br /> Table 4: Historical Groundwater Elevation Data <br /> Table 5: Historical Groundwater Analytical Data <br /> Table 6: Vapor Extraction Data <br /> Appendix A: Apex Standard Operating Procedures <br /> Appendix B: Field Data Sheets <br /> Appendix C: Laboratory Analytical Reports and Chain-of-Custody Forms <br />