My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011881
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
ARCHIVED REPORTS_XR0011881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 5:52:02 PM
Creation date
12/6/2019 4:53:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011881
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
First Quarter 2005 Groundwater Monitoring and Remediation Status Report <br /> Moore Petroleum Bulk Plant,5491 F Street,Banta,California <br /> / Page 4 <br /> November 10, 2003 -An addendum to the workplan was requested in a letter by the SJCEHD to <br /> increase the scope of work to further delineate the hydrocarbon plume by installing additional <br /> monitoring wells. Technical data on the ozone system and the spacing of the sparge points was <br /> also requested. On January 14, 2004, Apex submitted a report titled,Addendum to Workplan for <br /> Ozone Sparging. <br /> January 14, 2004 - Apex submitted a workplan entitled, Workplan for a Limited Subsurface Site <br /> Investigation, proposing the installation of five additional groundwater monitoring wells. <br /> May 12, 2004 - The SJCEHD responded to the aforementioned Addendum to Workplan for <br /> Ozone Sparging, by approving the proposed ozone sparge wells and requesting application for <br /> drilling permits. The SJCEHD requested an addendum to the workplan,proposing an additional <br /> cone penetration testing(CPT) boring and relocation of the proposed groundwater monitoring <br /> well MW-17. <br /> August 16, 2004 - The SJCEHD directed in a letter that an addendum be made to the Workplan <br /> for a Limited Subsurface Site Investigation, dated January 14, 2004, in order to define the vertical <br /> extent of contamination. Apex submitted the report titled, Workplan Addendum Letter for a <br /> Limited Subsurface Investigation, dated June 2, 2004. <br /> September 2004 - Apex installed and tested an SVE system with activated carbon adsorption as <br /> the control device. In addition, Apex installed an ozone generator system for eventual ozone <br /> sparging. Results from the SVE startup were reported to San Joaquin Valley Air Pollution <br /> Control District (SJVAPCD) in a letter dated November 11, 2005, entitled, Source Test Report. <br /> December 6-8, 2004 -Apex supervised the drilling of nine ozone sparge wells (OS-2 through <br /> OS-10). Results of the ozone well installations are reported by Apex in a document entitled, <br /> Interim Results Report for Ozone sparge wells dated March 4, 2005. <br /> GENERAL SITE INFORMATION <br /> Site name: Moore Petroleum <br /> Site address: 5491 F Street, Banta, California <br /> Current property owner: Van De Pol Enterprises, Inc. <br /> Current site use: Petroleum Bulk Plant <br /> Current phase of project: Groundwater monitoring, active soil vapor remediation <br /> Tanks at site: Two aboveground storage tanks <br /> Number of wells: 9 monitoring wells; 3 monitoring/vapor extraction wells; 2 <br /> vapor extraction wells; 1 recovery well; and 10 ozone <br /> sparge wells; 1 domestic well <br />
The URL can be used to link to this page
Your browser does not support the video tag.