My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011883
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
ARCHIVED REPORTS_XR0011883
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 5:50:54 PM
Creation date
12/6/2019 4:56:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011883
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y Interim Results Report for Ozone Sparge Well Installation <br /> �r Moore Petroleum Bulk Plant,5491 F Street,Banta,California <br /> Page 2 <br /> May 5, 1995 - A soil vapor extraction (SVE) system consisting of an R.S.I. SAVETM system was <br /> installed at the subject site. The vapor extraction system was installed per San Joaquin Valley <br /> Unified Air Pollution Control District permit conditions. The SVE system consisted of an <br /> internal combustion engine with catalytic converters mounted on the exhaust. The system was <br /> configured so soil vapors could be extracted from either vapor well VEW-1 and/or monitoring <br /> well MW-1. The system was started on May 5, 1995, and operated through October 4, 1995, at <br /> which time it was temporarily removed from the site. On November 27, 1995, the system was <br /> returned to the subject site and restarted. <br /> May 31, 1995 - An air sparge system was installed and started in conjunction with the SVE <br /> system. The air sparge system operated intermittently through August 30, 1995, at which time its <br /> operation began to coincide with the operation of the R.S.I. system. The air sparge system <br /> consisted of a one horsepower electric motor which powers a 10 cubic feet per minute(efm) oil- <br /> less compressor. The compressor injected air through an air sparge point located midway <br /> between VEW-I and MW-1 (Figure 2). <br /> April 29, 1997 - Apex received permission from the SJCEHD to shut down the air sparge and <br /> vapor extraction system due to low influent soil vapor concentrations to the vapor extraction <br /> system. As of April 29, 1997, the remediation system had extracted a total of 1,730 pounds of <br /> total petroleum hydrocarbons, as gasoline (TPHg), and 19.9 pounds of benzene. . <br /> V <br /> September 10, 1997 - Apex submitted the report titled, Over Excavation & Groundwater <br /> Removal Workplan, proposing over excavation, de-watering and sampling of the bulk loading <br /> rack and tank basins during the removal of nine underground storage tanks (UST). <br /> August 17, 1998 and September 8, 1998 -Apex supervised the removal of two 350 gallon USTs, <br /> T-8 and T-9 (kerosene and cleaning solvent, respectively). Also, seven 10,000-gallon USTs were <br /> removed on September 8, 1998. Following the removal of T-9, soil was over excavated and an <br /> exploratory trench was dug. Apex collected two soil samples and one groundwater sample from <br /> the over-excavation and exploratory trench. One soil sample was collected from beneath T-8. <br /> After the removal of the seven 10,000-gallon USTs, Apex collected four soil samples and one <br /> groundwater sample from the tank pit. Apex then collected six soil samples and two water <br /> samples from beneath the tank basin. Nine soil samples from the area beneath the former bulk <br /> loading rack were submitted for analysis. The results of all soil and water sampling were <br /> documented in the report titled, Tank Closure Results and Recommendations Report, dated <br /> December 23, 1998. <br /> April 8 - 9, 1999 - Apex personnel supervised the advancement of eight soil borings at the <br /> subject property. The results of all soil and water sampling were documented in the report titled, <br /> Results Report for Subsurface Investigation and Second Quarter 1999 Groundwater Monitoring, <br /> dated June 1, 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.