Laserfiche WebLink
May-13-03 09: 50A P.03 <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> ,o'Q ; �o SAN JOAQUIN COUNTY <br /> t/llir Supervisors <br /> Dunne K. Reran.R.F.H.S. Cnrl Bor•man.R.E.H.S. <br /> tor <br /> 3p4 East Weber Avenue, 'hhird Floor � <br /> N,. i nlr•r <br /> ,�. htiko Huggm.,RIALS.,K.U.I. <br /> At 01sru,R.E.H.S. Stockton, C'rllifumia 95202-2708 Douglas W.Wilson.R.E.H.S. <br /> • t; ih'ogr�m Alum)er <br /> Telephone (209) 4GR-3420 Mar�arct 1Cic1l io, R.E rts. <br /> Lauriv.A.Cntulla.R.F.II.S• Robert McC{ollon,R.E.H.S. <br /> ProRranr;t•�(lnn,�er Fax: (209)464-01 iR <br /> Mark Itarcollos.R.E.FI.S. <br /> May. CORRECTED DATE <br /> -t�pr-tl`6,2003 <br /> TO: San Joaquin County <br /> Community Development Department <br /> FROM: San Joaquin County <br /> Fnvironniental Health Department <br /> CONTACT PERSON: Mike Huggins, Supervising R.E.H.S., R.D.1. <br /> PHONE NUMBER: (209)468-3437 <br /> RE: IIA-03-185(I.A), Attention: Jennifer,Jolley <br /> 8256 West Waterwell Way,Tracy <br /> The Environmental Ilealth Department recommends approval of the prop ) ed lot line adjustment <br /> pruviiling the following San Joaquin County Development Title Requirements are met prior to <br /> recordation of the deed or record of survey: <br /> A. This prujcct shall provide public water service for Lot l prior to issuatice of building permits. <br /> A letter shall be submitted from the purveyor stating;that these services either are bonded for <br /> or are in place, prior to final approval (San Joaquin County Development Title, Section 9- <br /> 1120.2). <br /> B. Construction of individual-sewage disposal systems) under permit and inspection by the <br /> Frivirotunental Health Department is required at the tinie of development (San Joaquin <br /> County Development Title, Section 9-1 1 10.3 & 9-1 1 10.4). Lstate type zoning(R-R1)shall <br /> require a doable- leach-field-system with an alternating distribution box to be installed at <br /> time of construction. <br /> NO l'E: Due to the infonnatioli supplied in the Nitrate Loading Studies for this area, an <br /> alternative designed leach field will bu required for these parcels. <br /> D <br />