My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FETEIRA
>
3251
>
2900 - Site Mitigation Program
>
PR0505477
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 3:25:49 PM
Creation date
12/9/2019 3:17:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505477
PE
2950
FACILITY_ID
FA0006798
FACILITY_NAME
TRACY WESTGATE APTS
STREET_NUMBER
3251
STREET_NAME
FETEIRA
STREET_TYPE
WAY
City
TRACY
Zip
95376
APN
23808008
CURRENT_STATUS
02
SITE_LOCATION
3251 FETEIRA WAY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location of first aid kit: On drilling rig <br /> Nearest emergency medical facility: Tracy Community Memorial Hospital (835-1500) <br /> Directions from work site: Proceed south on Lammers Road and proceed approximately one half mile <br /> to Eleventh Street; turn left (east) on Eleventh Street and proceed approximately two miles to Tracy <br /> Boulevard; turn left (north) on Tracy Boulevard. and proceed 3.5 blocks to Hospital (on right @ 1420 <br /> Tracy Boulevard). <br /> Attach a map which shows the route from the work site to the nearest emergency medical facility, <br /> E7Check when done. <br /> KEY SAFETY PERSONNEL AND RESPONSIBILITIES <br /> All personnel working at the job site are responsible for project safety. The operational and health and safety <br /> responsibilities of pertinent personnel are identified below. <br /> PROJECT MANAGER: Russell Juncal <br /> The Project Manager is responsible for the provisions and submittal of this SSP to the Site Safety Officer <br /> P P Y <br /> (SSO) and for advising the SSO on health and safety matters. She/He has the authority to provide for the <br /> auditing of compliance with the provisions of this SSP,suspend or modify work practices, and to recommend <br /> disciplinary action for individuals whose conduct does not meet the provisions presented in this SSP. The <br /> Project Manager is also responsible for ensuring that Medical Surveillance Exams and Training Programs are <br /> current for all personnel working on-site. <br /> SITE SAFETY OFFICER: Russell Juncal <br /> The SSO is responsible for the dissemination of the information contained in this SSP to all personnel working <br /> at the job site,and to the responsible representative(s) of each subcontractor firm working at the job site. The <br /> SSO is responsible for ensuring the followingitems are adequately addressed: Safety Supplies and Equipment <br /> Inventory;Accident/Incident Reporting Procedures;Decontamination/Contamination Reduction Procedures; <br /> General Safe Work Practices. <br /> The SSO has the authority to suspend work anytime she/he determines the safety provisions set-forth in this <br /> SSP are inadequate to ensure worker safety. The SSO shall also inform the Project Manager of individuals <br /> whose conduct does not meet the safety provisions of this SSP. The Site Safety Officer reports to the Project <br /> Manager. A SSO or the alternate must be present during the field work operations. <br /> PAGE 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.