Laserfiche WebLink
Physical Hazards <br /> Task(s) Hazard Mitigation Measure <br /> 1 Heavy Equipment (Noise & All heavy equipment used on this project <br /> Physical contact) will be in good working order and <br /> operated in accordance with recognized <br /> industry standards and Cal-OSHA Title 8, <br /> Subchapter 4, Construction Safety Orders. <br /> In addition, an exclusion zone applies to <br /> all personnel. The exclusion zone will he <br /> 20 feet to the front and either side of the <br /> operating drill rig. Personnel will not be <br /> allowed under booms or augers at any <br /> time. <br /> All equipment operators and ground crews <br /> working in close proximity of heavy <br /> equipment will be supplied with ear <br /> protection. <br /> 1 Dust The dust hazard will be mitigated by not <br /> allowing ground crew to be located down <br /> wind of drilling and excavation activity. In <br /> addition, water will be applied to control <br /> the dust if visible levels of dust are <br /> generated. <br /> Fire and Explosion hazards <br /> List Flammable or Combustible materials on-site. Keep sources of ignition away from these materials. <br /> Flammable '(Flash sPoint <100 'IF) Combustible (Flash Point <200 <br /> Gasoline Diesel <br /> Type and Location of Fire Extinguishers (Show on map for large projects) : On drilling rig. <br /> PAGE 3 <br />