Laserfiche WebLink
0971c'-6 <br /> 5.0 TENTATIVE SCHEDULE <br /> Sampling will commence approximately three weeks after State and Local <br /> agency approval of the sampling plan. We estimate the time schedule as <br /> follows: <br /> Phase I Sampling 8 work days <br /> Phase I Analysis 15 work days <br /> Phase II Sampling 9 work days <br /> Phase II Analysis 15 work days <br /> Draft Report 30 work days <br /> Final Report 15 work days <br /> 6.0 STATE AND LOCAL AGENCY COORDINATION <br /> / The California State Department of Health Services (DOHS) will be given <br /> seven working days advance notice of the commencement of Phase I and II <br /> i� <br /> sampling. The DOHS will be advised of the work schedule at this time. <br /> Duplicate samples will be collected for DOHS. DOHS will be expected to <br /> provide its own personnel to receive the samples as well as all sample <br /> t containers and appropriate preservatives and shipping containers. <br /> r <br /> �{ 1 <br /> 8.0 PERSONNEL <br /> �a <br /> The following Woodward-Clyde personnel will be involved with this <br /> sampling program: <br /> r'- <br /> Christopher L. vais Project Manager <br /> David Parson Staff Engineer <br /> Y ✓�° Jay Kamine Staff Engineer <br /> Fred Wehrenberg Staff Engineer <br />