Laserfiche WebLink
Table 1 -Checklist of Required Data for no Further Action Requests at Underground Tank Sites <br /> Site Name and Location: Former Disco Site,Del Monte Foods,110 N.Filbert St.Stockton,CA <br /> 7. Tabulated results of all sampling and analyses; <br /> Detection limits for confirmation sampling <br /> Lead analyses <br /> Appendix D; <br /> Table 1.2-Soil Analyses from Disco Tank Excavation <br /> Table 3-4-Soil Supplemental Analyses <br /> Table 3-3-Soil Gas Results of May 20,1991 <br /> Soil Analytical Results <br /> Table 4-1 -Analytical Results for Petroleum Hydrocarbons Disco Site <br /> Selected Analytes in Soil Glacier Court,MW-15 <br /> Table 1 -Soil Analytical Data <br /> Lead(Soil) <br /> Benzene,Toluene,Ethelybezene,Xylene,and TPH-g <br /> Appendix E; <br /> Table 4-2-Analytical Results for Petroleum Hydrocarbons Disco Site <br /> Table 1 -Analytical Results for Petroleum Hydrocarbons Disco Site Additional <br /> Investigation Groundwater Samples <br /> Table 5-Historical Groundwater Analytical Results <br /> S. Concentration contours of contaminants found and those remaining in soil and groundwater,and <br /> both on-site and off-site; <br /> Appendix B; <br /> Figure S-A-Zone TPH-g Isoconcentration Map <br /> Figure 10-A-Zone Benzene Isoconcentration Map <br /> Figure 9-A-Zone 1,2-DCA Isoconcentration Map <br /> Appendix D; <br /> Soil Data Tables <br /> Lateral and vertical extent of soil contamination; <br /> Lateral and vertical extent of groundwater contamination; <br /> Appendix I; <br /> Contaminant Mass Calculations <br /> 9. Zone of influence calculated and assumptions used for subsurface remediation system and the <br /> zone of capture attained for the soil and groundwater remediation system; <br /> Appendix A; <br /> Closure Summary Form <br /> 10. Reports/information Unauthorized Release Form QMRS(Dates <br /> Appendix A; <br /> Closure Summary Form <br /> Well and boring logs PAR FRP Other(report name) <br /> Appendix F; <br /> Boring Logs <br /> 11. Best Available Technology(BAT)used or an explanation for not using BAT; <br /> Appendix A; <br /> Closure Summary Form <br /> 12. Reasons why background was/os unattainable using BAT; <br /> Appendix A; <br /> Closure Summary Form <br /> 13. Mass balance calculation of subsurface treated versus that remaining; <br /> Appendix I; <br /> Table 1 -Pre-Remediation Estimation of Mass in Soil and Groundwater Summary <br /> Tables 2-9 <br /> Table 10-Post-Remediation Estimation of Mass in Soil and Groundwater Summary <br /> Tables 11.17 <br />