My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
110
>
2900 - Site Mitigation Program
>
PR0519160
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 9:40:00 AM
Creation date
12/10/2019 9:25:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0519160
PE
2950
FACILITY_ID
FA0014329
FACILITY_NAME
DEL MONTE CAR WASH
STREET_NUMBER
110
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
02
SITE_LOCATION
110 FILBERT ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WELL CONSTRUCTION DETAILS <br /> Del Monte Foods-Former Disco Site <br /> Stockton,Califomla <br /> Top of <br /> Dale Casing Wall Depth Screen Borehole <br /> Wall Name Irderval Casing Materials Type of screen Slot Size Diameter Comments Location Data Source Visually <br /> Con ffiructetl Elevation ft- s <br /> ( b9 ) (ft- ) (inches) <br /> ) (Inches) Verified <br /> SVE-3 76.51 <br /> Historically/ Gauged at 2Ah Schedule 40 PVC Well Log/Total <br /> SVEume-NCurre12/1&7595ray —64 Soft rc <br /> 55-75 2-inch Schedule 40 PVC Slotted Casing 0.020 8 on-sue Depth <br /> eotlom Measurement <br /> SVE-4 76.51 <br /> Gauged at 2-inch Schedule 40 PVC Well Log/Total <br /> Historically/ 12/15/1995 55.75 2-inch Schedule 40 PVC 0.020 8 on- pt <br /> SVES Cumer4ty -45 Soft Slotted Casing sae Depth <br /> Bottom Measurement <br /> Notes: <br /> ft-msl=feet above mean sea level <br /> ft-bgs=feet below ground surface <br /> PVC=poly vary!chloride <br /> _#3 Monterey sand was used as the fitter pack <br /> "_#3 Monterey sand was used instead of concrete to set the temporary well bon <br /> Well Survey was completed on April 1,2009 <br /> Page 1 of 1 The Source Group,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.