CHRONOLOGY <br /> DEL MONTE/DISCO <br /> 110 N. FILBERT- SITE CODE: 2498 <br /> APN- 157-020-01 <br /> 1985 Tanks 6-8 removed. - )O aD0O f�^�� P6n pQe�a� ter <br /> 10/11/90 Site placed in LOP. Vz <br /> �e <br /> 45te d <br /> 4/18/91 Workplan approved for undergrKna tank,,-,&d <br /> investigation. <br /> 5hl/)20/91 Sol � red0 <br /> l�igoa? � (37�"1�' <br /> 1 <br /> 6/4/91 Drilling began of gil borinw �d �o^ -f-POvo�aH\ rAW j)24/91 �Prri <br /> 2 additional wells drilled (MW-2 and MW-3 drilled) <br /> 8/26/91 MW-4 installed. <br /> 8/27/91 MW-5 installed. <br /> 8/28/91 MW-6 installed. <br /> 8/29/91 MW- 7S installed. <br /> 9/16/91 MW-7D installed. <br /> 6/30/92 MW-1, MW-2, and MW-3 scheduled to be sampled <br /> annually until remediation system begins . Beth <br /> Thayer of the RWQCB requests that at least one of <br /> these wells be sampled quarterly. <br /> 8/26/92 Quarterly groundwater report reviewed. <br /> 9/4/92 Reviewed quarterly report . <br /> 9/23/92 Reviewed quarterly report . <br /> 10/1/92 Groundwater sampling occurred. S S JJ U `v� i ✓^A <br /> 11/4/92 Quarterly report reviewed. W U /� <br /> 1/21/93 Groundwater sampling occurred. <br /> 2/25/93 Reviewed quarterly report . <br /> 3/29/93 Groundwater sampling occurred. <br /> 5/14/93 Reviewed quarterly report . � p <br /> 7/30/93 Groundwater sampling occurred. (I,allc) e� C� U3 <br />