Laserfiche WebLink
DISCO PROPERTY,STOCKTON.CALIFORNIA <br /> hydrocarbons,then additional boreholes will be drilled further downgradient until the <br /> grab groundwater results indicate the vicinity of the plume fringe. <br /> • Upon determining the approximate location of the downgradient plume fringe,PHS <br /> will be consulted and a shallow monitoring well will be installed that is screened across <br /> the water table. Based on the extent of the downgradient plume, one additional shallow <br /> monitoring well may be proposed if downgradient lateral coverage is not sufficiently <br /> provided by one well. <br /> • One deep well will be installed in the vicinity of the downgradient shallow well. This <br /> well will be screened at a similar depth interval as MW-11D. <br /> • Wells installed during this phase of work will be developed using the standard protocol <br /> used for previously installed wells at the property.. <br /> Subtask 3 Laboratory Analysis <br /> Grab groundwater samples from Activity II will be submitted to a state certified laboratory. <br /> The samples will be analyzed for TPH as gasoline,BTEX,and MTBE. The grab groundwater <br /> samples will be analyzed in a 24-hour turnaround time period. <br /> Subtask 4 Reporting <br /> The report for this phase of work will be combined with Activity III. The report contents are <br /> described under Activity III. <br /> Activity III - Installation of Upgradient Monitoring Well <br /> Based on the findings of Activity I and existing upgradient well data,the value and <br /> necessity of conducting Activity III will be revisited. If necessary, the purpose of Activity <br /> III will be to install an upgradient well in the vicinity of the known release that intersects <br /> the current water table;the existing upgradient wells do not intersect the current water <br /> table. <br /> If it is determined that Activity III is necessary, then this activity will be conducted at the <br /> same time as Activity II using similar protocols. <br /> Subtask 1 Prefield <br /> There appears to be no need to perform any conventional prefield because the permits will <br /> have already been acquired during Activity I,the health and safety plan will have been <br /> written, and the utilities will have been cleared. <br /> Subtask 2 Field Activities <br /> If necessary,the field activities will include drilling and installing a monitoring well that is <br /> screened across the present-day static water elevation.The location of the well will be <br /> determined after consultation with PHS. The well will be drilled and installed using the <br /> same methods described in Activity I. The borehole will be continuously cored to 65 feet <br /> bgs. Soil samples will be screened in the field and samples will be submitted to a state <br /> 6 <br />