Laserfiche WebLink
HEM Tit <br /> i9;i T�� I <br /> AMI1� 48 <br /> November 1, 1995 <br /> Project 131420.01.04 <br /> Margarett Lagorio <br /> San Joaquin County Health Department <br /> P.O. Box 388 <br /> Stockton, CA 95201-0388 <br /> Subject Well Permits for SVE system at Del Monte Disco Site <br /> j <br /> Dear Margarett: <br /> I <br /> This letter is being submitted per the directive issued in the PHS/EHD letter dated 10/2/95 <br /> requiring the submittal of a work plan for additional wells by November 10, 1995 at the Del <br /> Monte site (former Disco Gas Station) located at 110 North Filbert Street, Stockton, <br /> California. In a telephone conversation with Margarett Lagorio, PHS/EHD expressed a <br /> i concern about the effectiveness of dual soil vapor extraction and air sparging well <br /> completions in the same borehole. The PHS/EHD suggested Del Monte install an additional <br /> vapor extraction well without an air sparging component. The non-aqueous phase liquid <br /> (NAPL) encountered in the construction of piezometer clusters NP-1 and NP-2 shows that <br /> vadose zone contamination may extend beyond the present radius of vapor extraction <br /> influence. We originally assumed that the extent of vadose zone NAPL was limited to the <br /> i area beneath the three former USTs described in the RDFS (CH2M HILL, February 1992). <br /> Piping removed from the site, that formerly conveyed gasoline from tanks to pump islands, <br /> was found to be thoroughly corroded. Leakage from the piping may have been the source of <br /> the NAPL phase contamination found in the vadose soils at NP-1 and NP-2. <br /> Del Monte proposes the drilling of 2 additional borings and the conversion one or both of the <br /> borings into SVE wells (Figure 1). The attached figure shows the proposed locations for the <br /> borings. These borings are being drilled to further characterize the extent of impacted soil at <br /> the site. In addition the conversion of one or both of these borings will expedite the <br /> remediation procedures and increase the radius of capture of the existing system. Boring SB- <br /> c:\work\word\delmonte\p1an03\svedril.doc <br /> t <br />