Laserfiche WebLink
..-. _Q <br /> Meeting Agenda— Del Monte DISCO Site <br /> 10:00 AM, August 2, 2000 <br /> Attendees: <br /> Ron Rowe/SJC PHS/EHD Steve Ronzone/Del Monte <br /> Margaret La orio/SJC PHS/EHD Steve Erickson/Del Monte <br /> Marty Hartzell/CVRWQCB Keith Sheets/CH2M HILL <br /> Rich Fish/Del Monte <br /> Purpose: To discuss latest site characterization results and receive comments to the CPT <br /> site characterization report. Agree upon number, location, and depths of additional <br /> monitoring wells to be installed downgradient of the site. Discuss potential remediation <br /> scenarios. <br /> 1. Introductions 10:00-10:15 <br /> • Review purpose of meeting <br /> 2. Discuss Additional Site Characterization Report 10:15-11:15 <br /> • Discuss stratigraphy—See cross-section overheads <br /> • Discuss groundwater results <br /> • Horizontal and vertical extent of benzene and 1,2-DCA—See plume map <br /> 1 overheads and cross-section overheads <br /> • Additional CPT borings may be installed to delineate extent of <br /> 1,2-ACA—See aerial photograph for potential drilling locations <br /> 3. Discuss proposed locations of additional monitoring wells 11:15-11:45 <br /> • See map of proposed locations <br /> • Discuss logistical implications <br /> • CalTrans issues re: drilling on Highway 4 and Filbert St. east-bound on-ramp <br /> I • Safety concerns about developing and sampling wells installed on Highway 4 <br /> I <br /> I 4. Discuss potential remediation scenarios 11:45-12:15 <br /> • Analysis of fate and transport behavior of benzene/1,2-DCA needed. <br /> i • Feasibility analysis of potential remedial options needed. Evaluation of remedial <br /> options based on: <br /> • Cost, implementability, and technical feasibility <br /> 5. Draft Schedule— <br /> �t9 <br /> Receive CPT Investigation report comments from PHS: August 11 <br /> { Submit work plan for monitoring well installation to PHS: August 31 _ <br /> Receive PHS comments to work plan: September 11 <br /> Begin mobilization for drilling: September 18 <br /> I Installation of monitoring wells: Sept. 25-Oct. 6 <br /> i <br /> L <br /> I: <br /> G:\EBG\DELMONTE\PLANT_33Vvteetings\6_2_00 meetingU1eeting Agenda 8_2_OO.dx <br />