Laserfiche WebLink
k" KLEINFELDER <br /> The objective of this workplan is to outline the pilot test strategy to evaluate these two <br /> technologies and assess the overall effectiveness of the approach. In addition, provided the test <br /> indicates the approach is feasible, a subsequent report will outline preliminary design parameters <br /> to ultimately install a full-scale remediation system utilizing these technologies based on the pilot <br /> test data. These design parameters would be utilized later in a Corrective Action Plan (CAP) for <br /> the site. <br /> i <br /> 1228012002R476 Page 3 of 26 <br /> Copyright 2002 Kleinfelder,Inc. May 17,2002 <br />