Laserfiche WebLink
I <br /> kT1 KLEINFELDER <br /> The general direction of groundwater flow in the area of the site, based on the most recent data <br /> issued by the San Joaquin County Flood Control and Water Conservation District, (Spring 1999), <br /> and past reported data from groundwater monitoring events, is to the southeast. The elevation of <br /> first groundwater.is approximately-20 feet below mean sea level. According to the same report, <br /> the depth to groundwater in the vicinity of the project site is approximately 45 feet below grade. <br /> I <br /> 4 <br /> 12280/2002R476 Page 5 of 26 <br /> Copyright 2002 Kleinfelder,Inc. May 17,2002 <br />