Laserfiche WebLink
i <br /> a <br /> a <br /> • Reference such as maps of the sampling site <br /> • Field observations <br /> i. 0 Any field measurements made <br /> • Signature and date by the personnel responsible for observations <br /> • Decontamination procedures <br /> i <br /> { Sampling situations vary widely. No general rules can specify the extent of information that <br /> must be entered into a log book or standardized form. However,records will contain <br /> sufficient information so that the sampling activity can be reconstructed without relying on the <br /> collector's memory. <br /> 4.6 Laboratory Quality Assurance <br /> All samples collected during this project will be analyzed for the selected parameters in <br /> accordance with standard accepted methods.Data packages will be requested from the <br /> laboratory for providing quality control data for data validation. <br /> SECTION 5 <br /> Reporting and Schedule <br /> i <br /> 5.1 Reporting <br /> The results of the additional sampling and analyses performed for the Disco site will be <br /> presented in a report. The report will include cross section(s) and discussion of the nature and <br /> extent of petroleum hydrocarbon plume in groundwater, CPT logs, summary of results, <br /> laboratory analytical data sheets, and conclusions and recommendations. Any significant field <br /> decisions and modifications to this work plan will be documented in the report. <br /> f <br /> 5.2 Scheduling <br /> The work plan will be submitted to the PHS/EHD by October 8, 1999. Thirty days after non- <br /> conditional approval of the work plan,field work will begin. The final report will be <br /> submitted to the PHS/EHD,45 days after completion of the field work. <br /> SECTION 6 <br /> + <br /> References <br /> Central Valley Regional Water Quality Control Board, 1991,TRI-Regional Board Staff Recommendations <br /> for Preliminary Investigation and Evaluation of Underground Tank Sites,Appendix A,August <br /> Exceltech, 1985,Tank Excavation Report,Disco Sites. <br /> CH2M HILL, 1995, Problem Assessment Report(PAR) and Final Remediation Plan(FRP), <br /> April. <br /> SFOICABERNETIGROUPSIEBGIDELMONTEIPLANT_33IWORKPLAN_CPT.DOC 11 <br />